General introduction of the building
Architecture solution of the building
Drawing plan layouts and sections
Technical and infrastructure solutions

Nguyen Duc Duy-565556-56XE

1


Graduate project

CHAPTER I. GENERAL INTRODUCTION
I.1 BUILDING LOCATION
Lapaz Tower locates at 38 Nguyen Chi Thanh, Thach Thang, Hai Chau district, Da Nang
city. It is very near from the building to the school, hospital, Danang administrative
center, Han river bridge…The building is expected to promote the economy and tourism
development of the city.

Figure 1. 1 Location of La Paz Tower
The building is a complex of apartments, services.. and owned by Danang Housing
investment development joint stock company.
I.2 INVESTMENT NECESSARY
In the recent years, Vietnam’s economy has changed dramatically along with the rapid
growth of the other countries in Asia. The reconstruction and construction of
infrastructure is really needed. On the other hand, the replacement of low-rise buildings
by high-rise buildings is very necessary to resolve land issues as well as changing the
urban landscape to deserve with the stature of a large city.
Danang is one of the most important cities in Vietnam. With many beautiful landscapes,
Danang attracts million tourists each year. Nowadays, more and more people want to live
and work in Danang. Therefore, the construction of a high-rise building like La Paz Tower
is essential and appropriate to deal with the issue. After constructed, the building also will
be one of the landmarks or the city.

Nguyen Duc Duy-565556-56XE

2



Graduate project
I.3 SCALE AND GENERAL FEATURES
The project consists of 17 upper stories and 2 basements. The total high of the building is
64.8m from ±0.000 level and the basement is at -4.400m deep.
The functions:
− Basement 1 and 2 is used as a parking area for residents and customers. The
technical rooms like power room, pumping room…is put in the basement 2.
− The first floor: mini supermarket, mini shop and office rooms for hire.
− The second floor: office rooms for hire.
− Floor 3- 17: residental apartments.
− The eighteenth floor: lift technical room and water tank.
The technical parameters:






Each basement area: 596 m2.
The first floor area: 594 m2.
The second floor area: 616 m2.
The third to seventeenth floor area: 625 m2.
The eighteenth floor area: 80 m2.

CHAPTER II. ARCHITECTURE SOLUTION
II.1 DESIGN OF MASTER PLAN
There are 2 basements that is used for parking and putting some technical system like
water tank, power room…The area of each basement is 596m2. There is a staircase from
the basement 2 for people moving conveniently.
The first and second floor are used for market, shop, office for release. 2 elevators and 1
staircase are installed to move vertically.
Apartments are located from the third to the seventeenth floor. Each apartment is designed
independently and connected together by lobbies.
There are 7 apartment types:






S1 and S4 apartment: 2 bedrooms – S=92.6m2.
S2 and S3 apartment: 2 bedrooms – S=74m2.
S5 apartment: 2 bedrooms – S=96.5m2.
S6 apartment: 1 bedroom – S=44.8m2.
S7 apartment: 2 bedrooms – S=78.1m2.

In each floor, the lobbies are designed to move conveniently. The elevators are the center
of the floor. There is a emergency staircase that is used for dangerous situation.
Nguyen Duc Duy-565556-56XE

3


Graduate project
II.2 DESIGN OF FACADE
The building has a modern shape and is designed as a landmark of Danang city.
The building is exposed the sunshine extremely from all 4 directions. The doors and
windows are made of color glass, that make the building more beautifully.
II.3 DECORATED MATERIAL SOLUTION
High quality inland materials are used for the building like granite and ceramic tiles
VIGRACERA, sanitary wares INAX. Using industrial timber for doors, glass material for
windows.

CHAPTER III.

TECHNICAL AND INFASTRUCTURE SOLUTION

III.1. LIGHTING SYSTEM
Natural light is fully utilized. The window systems in all facades are glazed. In addition,
artificial light is also arranged so that it can cover all points that need lighting.
III.2. VENTILATION SYSTEM
Through the window system, natural ventilation is fully utilized. Besides, there is air
conditioning system. The pipe system is laid in the vertical and horizontal technical box,
distributes evenly to the places of consumption.
III.3. POWER SYSTEM
The medium voltage line 15KV goes to the substation through the underground pipe
system. There is also backup power, two generators, located in the basement of the
building. When main power is lost, the generators will serve the following cases:
- The fire protection system
- Lighting system and protection
- Working offices
- Vertical transport system
- Computer system and other critical services.
III.4. WATER SUPPLY AND DRAINAGE SYSTEM
III.4.1 Water supply
Water from the water supply system of the city goes into the underground tank situated in
the basement of the building. Water is pumped to the roof tank automatically, and then
follows the technical pipeline to the consumptions.

Nguyen Duc Duy-565556-56XE

4


Graduate project
III.4.2 Drainage
Rainwater on the roof, logia, balcony, and domestic wastewater is collected to se-no
leading to the treatment tank. Handled water will be given to the drainage system of the
city.
III.5. FIRE PROTECTION SYSTEM
III.5.1 Fire alarm system
Fire alarm detection devices are arranged in each room at every floor, public place of each
floor. Fire alarm network is mounted alarm clocks and lamps. The management
department controls fire as soon as receive the fire signal.
III.5.2 Firefighting system
This system is designed based on the fire prevention requirements and other relevant
standards (including fire preventing component, escape exits, firefighting water). CO2
cylinders are set at the intersections in all stories.
III.6. WASTE DISPOSAL SYSTEM
Waste of each floor will be collected and taken downstairs technical storey, basement by
waste collection tube. The waste is processed every day.