Tải bản đầy đủ

Vietnam da nang sustainable city development project environmental assessment (vol 2) appendix (english, vietnamese)

Public Disclosure Authorized
Public Disclosure Authorized
Public Disclosure Authorized
Public Disclosure Authorized

Updated EMP Report – The Adjustment Works under the Danang SCDP

ANNEXES
I. Appendix 01: The legal documents related to the project ................................................. 2
II. Appendix 02: Map of the locations of environmental monitoring ................................ 13
III. Appendix 03: Minutes of the public consultation meeting ........................................... 16
1. Hai Chau 2 ward: .................................................................................................................. 16
2. Nam Duong ward: ................................................................................................................ 20
3. Binh Thuan ward: ................................................................................................................. 24
4. Binh Hien ward: ................................................................................................................... 28
5. Phuoc Ninh ward: ................................................................................................................. 31
6. Thach Thang ward: ............................................................................................................... 35
7. Hai Chau 1 ward: .................................................................................................................. 39
8. Thanh Binh ward: ................................................................................................................. 43
9. Hoa Khanh Bac ward:........................................................................................................... 47
10. Hoa Hiep Nam ward: .......................................................................................................... 51

11. An Hai Bac ward: ............................................................................................................... 55
12. An Hai Dong ward: ............................................................................................................ 59
13. My An ward: ....................................................................................................................... 62
14. Chinh Gian ward: ............................................................................................................... 66
15. Hoa Khuong commune: ...................................................................................................... 69
16. Hoa Hai commune: ............................................................................................................. 75
17. Thac Gian ward: ................................................................................................................. 80
18. Hoa Nhon commune ........................................................................................................... 84
19. Hoa Nhon commune ........................................................................................................... 89
IV. Appendix 04: Some pictures of the project .................................................................... 94
4.1. SOME PHOTOS OF PROJECT AREA STATUS ........................................................... 94
2.2. SOME PHOTOS OF PUBLIC CONSULTATION .......................................................... 96
2.3. SOME PHOTOS OF BASELINE ENVIRONMENTAL MONITORING ..................... 100
Appendix 05: The results of environmental monitoring ................................................... 103
1. Analytical results of air samples ......................................................................................... 103
2. Analytical results of groundwater samples ......................................................................... 107
3. Analytical results of surface water samples ....................................................................... 108
4. Analytical results of wastewater samples ........................................................................... 112
5. Analytical results of soil samples ....................................................................................... 113
6. Analytical results of sediment samples .............................................................................. 115
7. Analytical results of aquatic samples (TS1) ....................................................................... 116
8. Analytical results of aquatic samples (TS2) ....................................................................... 117
9. Analytical results of aquatic samples (TS3) ....................................................................... 118
10. Analytical results of aquatic samples (TS4) ..................................................................... 119
11. Analytical results of aquatic samples (TS5) ..................................................................... 120

Consultant: IAC Vietnam

Page 1


Updated EMP Report – The Adjustment Works under the Danang SCDP

I. Appendix 01: The legal documents related to the project

Consultant: IAC Vietnam

Page 2



Updated EMP Report – The Adjustment Works under the Danang SCDP

Consultant: IAC Vietnam

Page 3


Updated EMP Report – The Adjustment Works under the Danang SCDP

Consultant: IAC Vietnam

Page 4


Updated EMP Report – The Adjustment Works under the Danang SCDP

Consultant: IAC Vietnam

Page 5


Updated EMP Report – The Adjustment Works under the Danang SCDP

Consultant: IAC Vietnam

Page 6


Updated EMP Report – The Adjustment Works under the Danang SCDP

Consultant: IAC Vietnam

Page 7


Updated EMP Report – The Adjustment Works under the Danang SCDP

Consultant: IAC Vietnam

Page 8


Updated EMP Report – The Adjustment Works under the Danang SCDP

Consultant: IAC Vietnam

Page 9


Updated EMP Report – The Adjustment Works under the Danang SCDP

Consultant: IAC Vietnam

Page 10


Updated EMP Report – The Adjustment Works under the Danang SCDP

Consultant: IAC Vietnam

Page 11


Updated EMP Report – The Adjustment Works under the Danang SCDP

Consultant: IAC Vietnam

Page 12


Updated EMP Report – The Adjustment Works under the Danang SCDP

II. Appendix 02: Map of the locations of environmental monitoring
2.1. Time: June,2015

Consultant: IAC Vietnam

Page 13


Updated EMP Report – The Adjustment Works under the Danang SCDP

2.2. Time: December, 2015

Consultant: IAC Vietnam

Page 14


Updated EMP Report – The Adjustment Works under the Danang SCDP

Consultant: IAC Vietnam

Page 15


Updated EMP Report – The Adjustment Works under the Danang SCDP

III. Appendix 03: Minutes of the public consultation meeting
1. Hai Chau 2 ward:

Consultant: IAC Vietnam

Page 16


Updated EMP Report – The Adjustment Works under the Danang SCDP

Consultant: IAC Vietnam

Page 17


Updated EMP Report – The Adjustment Works under the Danang SCDP

Consultant: IAC Vietnam

Page 18


Updated EMP Report – The Adjustment Works under the Danang SCDP

Consultant: IAC Vietnam

Page 19


Updated EMP Report – The Adjustment Works under the Danang SCDP

2. Nam Duong ward:

Consultant: IAC Vietnam

Page 20


Updated EMP Report – The Adjustment Works under the Danang SCDP

Consultant: IAC Vietnam

Page 21


Updated EMP Report – The Adjustment Works under the Danang SCDP

Consultant: IAC Vietnam

Page 22


Updated EMP Report – The Adjustment Works under the Danang SCDP

Consultant: IAC Vietnam

Page 23


Updated EMP Report – The Adjustment Works under the Danang SCDP

3. Binh Thuan ward:

Consultant: IAC Vietnam

Page 24


Updated EMP Report – The Adjustment Works under the Danang SCDP

Consultant: IAC Vietnam

Page 25


Tài liệu bạn tìm kiếm đã sẵn sàng tải về

Tải bản đầy đủ ngay

×